Hyderabad

Balkapur Nala Works Under SNDP Inspected: MLA Kausar Mohiuddin Pushes for Completion Before Monsoon

Balkapur Nala works under SNDP in Hyderabad inspected by MLA Kausar Mohiuddin. Officials directed to complete drainage work before monsoon for smooth water flow.

In a key development, Balkapur Nala works under SNDP (Strategic Nala Development Program) were inspected in Hyderabad, with officials directed to ensure smooth water flow before the monsoon. The inspection was carried out on the instructions of Asaduddin Owaisi, highlighting urgency in strengthening the city’s drainage system.

Balkapur Nala Works Under SNDP Inspected in Hyderabad

The inspection was led by Kausar Mohiuddin, along with senior officials from GHMC and SNDP wing. The team visited the Balkapur Nala culvert backside near Community Hall at Hakeempet, where ongoing development works are in progress.

Officials present during the inspection included:

  • P. Mohan Reddy, Superintending Engineer, SNDP Wing GHMC
  • R. Sravan, Deputy Executive Engineer
  • Mohd Azam Ali, Assistant Executive Engineer
  • B. Mahendar Reddy, Assistant Executive Engineer
  • A. Sriman Narayan Reddy, Contractor

CC Bed Laying Work to Improve Drainage Flow

During the visit, authorities reviewed the CC bed laying work inside Balkapur Nala, which is being executed under the SNDP initiative.

The objective of this work is to:

  • Ensure smooth and uninterrupted water flow
  • Prevent water stagnation and flooding
  • Strengthen the drainage system from Balkapur Nala up to the Military area

Instructions to Speed Up Work Before Monsoon

MLA Kausar Mohiuddin interacted directly with the contractor and instructed them to:

  • Speed up ongoing work
  • Maintain quality standards
  • Ensure completion before the onset of monsoon

The urgency comes as Hyderabad prepares for the rainy season, where efficient drainage is critical to avoid urban flooding.

Commitment to Drainage Infrastructure Under SNDP

The Balkapur Nala works under SNDP in Hyderabad reflect continued efforts to upgrade the city’s drainage infrastructure. These works aim to reduce waterlogging issues and improve overall civic conditions in the Karwan area.

Local AIMIM leaders and party workers were also present during the inspection.

The Balkapur Nala works under SNDP in Hyderabad, inspected by MLA Kausar Mohiuddin under the guidance of Asaduddin Owaisi, highlight the focus on ensuring smooth water flow before monsoon. With clear instructions to accelerate progress, authorities aim to complete the drainage work on time and prevent flooding in the area.

Follow MunsifNews24x7 for latest updates.

Related Stories

Mohammed Yousuf

Senior Content Editor – Hyderabad & Telangana Affairs!Mohammed Yousuf is a Senior Content Editor at Munsif News 24x7, covering Hyderabad and Telangana affairs.With over a decade of experience in journalism, Yousuf reports on governance, public issues, law and order, and political developments.He regularly contributes breaking news and in-depth reports to Munsif News 24x7.
Back to top button