Hyderabad Model Corridor: Major Traffic Reforms Planned from Shaikpet to Masab Tank
Hyderabad Model Corridor from Shaikpet to Masab Tank gets major boost with road widening, FOBs, and ₹120 crore traffic improvement plan.

Hyderabad: In a major step toward easing congestion, a field inspection for the Hyderabad Model Corridor from Shaikpet to Masab Tank was conducted by V. C. Sajjanar and R. V. Karnan along with senior officials.
Table of Contents
The inspection focused on identifying bottlenecks and accelerating traffic improvement works on the Shaikpet–Masab Tank corridor in Hyderabad, one of the city’s busiest routes.
Key Decisions to Improve Traffic in Hyderabad Corridor
During the inspection, officials took several important decisions to address traffic congestion in Shaikpet, Tolichowki, Mehdipatnam, and Masab Tank.
Major Observations
- Water-logging points identified at Shaikpet Flyover ramp and Tolichowki
- Proposal for a new Foot Over Bridge (FOB) at S.D. Eye Hospital
- Instructions issued to remove road obstructions to speed up work
Works Planned Under Tolichowki Traffic Police Limits
Pedestrian Safety Measures
- New FOB at Brindavan Colony Road No. 1
- Installation of pelican signals and zebra crossings at Shaikpet Nala
Road & Drainage Improvements
- Fixing drainage leakages at Tolichowki U-turn and Al-Hasnath Colony
- Construction of CC road from Ice Magic Parlour to Brindavan Colony
- New bus shelter at Majestic Function Hall
- Tree relocation near Shah Ghouse Hotel
Officials also decided to reduce the rotary width at Nanal Nagar Junction and widen roads to ensure smoother traffic.
Rethibowli to Nanal Nagar: Road Widening & Encroachment Removal
To improve traffic flow on this stretch:
- Central median and trees will be removed for road widening
- Removal of Ramalayam Arch, Boddurayi (Golf Club Road), and tombs near Shaikpet Nala
- Creation of a free left turn from Balika Bhavan towards Tolichowki
These steps aim to eliminate daily bottlenecks in the Hyderabad Shaikpet–Masab Tank corridor.
Asif Nagar & Masab Tank: Major Infrastructure Upgrades
Key Developments
- New FOB at S.D. Eye Hospital
- Removal of old rumble strips and adjustment of Sulabh Complex
- Bus shelter shifting for better traffic movement
Road Expansion & Safety
- Land acquisition near NMDC and Dell Store for road widening
- Installation of height restriction barriers and warning boards at Masab Tank Flyover
- Transformer shifting at Mehdipatnam end
Connectivity Boost
- Development of a slip road connecting Pochamma Basti to Road No. 12
₹120 Crore Allocation for Hyderabad Traffic Improvements
Officials confirmed:
- ₹120 crore allocated for traffic upgrades (₹20 crore per zone)
- Bottlenecks categorized into immediate (doable) and long-term solutions
- Pending works at KBR Park to be completed in 1.5 to 2 years
Senior Officials Participate in Inspection
The inspection included multiple senior officers from traffic police, GHMC, and planning departments, ensuring coordinated execution of the Hyderabad Model Corridor project from Shaikpet to Masab Tank.
The Hyderabad Model Corridor from Shaikpet to Masab Tank is set to transform traffic flow with road widening, FOB construction, and infrastructure upgrades. With ₹120 crore funding and coordinated planning, the project is expected to significantly reduce congestion and improve daily commute across key city areas.
Follow MunsifNews24x7 for latest updates.